Joint Base Andrews begins Huey-to-HH-60W helicopter transition
Joint Base Andrews has taken delivery of its first HH-60W Jolly Green II, marking the start of a long-planned changeover from the UH-1N Huey fleet that has flown there for about six decades, according to Military Times.
Snapshot
The base is set to receive 26 HH-60Ws total, with the new helicopters bringing more speed, range, fuel capacity, and airlift capability than the Hueys they replace, Military Times reports. The handoff will happen gradually, with one squadron flying old and new side by side for a stretch before the fleet fully transitions.
Key points
- First arrival: The first of 26 HH-60W Jolly Green IIs has landed at Joint Base Andrews, according to Military Times.
- Performance jump: The HH-60W offers greater speed, range, fuel capacity, and airlift capability than the UH-1N Huey it's replacing, per the report.
- Squadron split: The 5th Helicopter Squadron will fly the new HH-60Ws first, while the 1st Helicopter Squadron keeps flying Hueys until it transitions.
- Timeline: Military Times reports training on the new airframe begins in 2027, with initial operational capability expected by 2029 and full operational capability by 2030.
- End of an era: The Huey has supported Joint Base Andrews for roughly 60 years, according to the report.
Quick take
For gun owners who follow military hardware and veterans' news, this is a straightforward modernization story: a Vietnam-era airframe finally gets retired in favor of a helicopter built for longer legs and heavier loads. The multi-year, phased timeline reflects how slowly big fleet transitions move even when the need is well understood, and it's worth watching how the 1st Helicopter Squadron's Huey missions get covered during the overlap period.
Read the full story: militarytimes.com